All measures

Compare measures as a connected plan

There is no single best measure for every home. Consider technical conditions, planned work and the effect on later choices.

Order

Four layers of a home plan

  1. 1

    Preconditions

    Resolve safety, moisture and structural issues first.

  2. 2

    Heat demand

    Review insulation, glazing, draughts and ventilation.

  3. 3

    Building systems

    Match heating and hot water to the improved home.

  4. 4

    Generation and flexibility

    Then consider solar, smart charging and storage.

This is a decision framework, not a fixed answer. Planned renovation or an already well-insulated home may justify a different order.

Catalogue

Ten parts of Slim Woonplan

01First priority

Insulation

Reduce heat loss while considering moisture, draughts and ventilation.

Check firstBuilding element, current construction and timing
02First priority

Heat pump

Assess the home, heat emitters and heat demand as one system.

Check firstInsulation, radiators and available space
03First priority

Home battery

Consider storage through your usage profile, generation and intended purpose.

Check firstInterval data, inverter, phases and purpose
04First priority

Solar panels

Match system size to roof, demand and opportunities for self-consumption.

Check firstOrientation, shade, roof area and demand
05Next cluster

Energy contract

Compare contract types alongside generation, charging and flexible demand.

Check firstDemand profile, generation and risk preference
06Next cluster

Smart energy management

Understand consumption and control devices where it creates real value.

Check firstMetering, compatible devices and automation
07Next cluster

Home EV charger

Consider grid connection, vehicle, charging speed and smart control together.

Check firstGrid capacity, phases, vehicle and parking
08Next cluster

Air conditioning for heating

Assess comfort, noise and its role alongside the existing heating system.

Check firstRooms, placement, noise and usage pattern
09Next cluster

Ventilation

Keep indoor air and moisture control part of every insulation step.

Check firstCurrent extract, supply and home layout
10Next cluster

Glazing and frames

Review glazing, frame condition and draught proofing as one building choice.

Check firstExisting frame, glass area and renovation plan
In development

Every guide will include sources, a review date and clear limits.

Content is added in phases. We do not publish costs or returns until the source and validity period have been recorded.

View our method